Conference Chairs:
Dr. Rudolf Pöttler
ILF Consulting Engineers, Austria
Prof. Herbert Klapperich
Freiberg University for Mining and Technology, Germany
Conference Co-Chairs:
Ms. Janette Keiser
Central Puget Sound Transit Authority, USA
Prof. Hiroyasu Ohtsu
Kyoto University, Japan
UNITED ENGINEERING FOUNDATION, INC.
Three Park Avenue, 27th Floor
New York, NY 10016-5902
T: 1-212-591-7836 - F: 1-212-591-7441
E: engfnd@aol.com - www.engfnd.org/2ar.html
SUNDAY, 15 September 2002
16:00 - 18:00 Registration
18:00 - 19:00 Welcome Reception
19:00 - 20:30 Vernissage
Art Exhibition - Mary Lou, "Risk-Visions and Dialog," Conference Center Gallery
20:30 - 22:00 Dinner
MONDAY, 16 September 2002
07:00 - 08:30 Breakfast
08:30 - 08:45 Opening Remarks
Rudolf Pöttler, Conference Chair
Herbert Klapperich, United Engineering Foundation
Hans Suenkel, Graz University of Technology, Austria
08:45 - 10:30 Session 1A: State of the Art
Session Chair: Helmut Schweiger
Session Co-chair: D. Vaughan Griffiths
Keynote Address
PROBABILISTIC GEOTECHNICAL ANALYSIS: HOW DIFFICULT DOES IT NEED TO BE?
D. Vaughan Griffiths, Derena E. Tveten, Colorado School of Mines, USA
Gordon A. Fenton, Dalhousie University, Canada
UNCERTAINTY IN TUNNELLING
Anthony A. Van Tol, Simaan M. AbouRizk, University of Alberta, Canada
K. C. Er, Siri Fernando, City of Edmonton, Canada
MEANING AND UNCERTAINTY OF GEOTECHNICAL RISK ASSESSMENT - THE FUZZINESS OF FAILURE PROBABILITIES
Michael Oberguggenberger, Wolfgang Fellin, University of Innsbruck, Austria
PRACTICAL FIRST ORDER RELIABILITY COMPUTATIONS USING SPREADSHEET
B. K. Low, Nanyang Technological University, Singapore
K. K. Phoon, National University of Singapore, Singapore
10:30 - 11:00 Coffee Break
11:00 - 12:30 Session 1B: State of the Art
Session Chair: D. Vaughan Griffiths
Session Co-chair: Helmut Schweiger
ASSESSMENT OF FRACTIAL BEHAVIOUR OF SOILS
Mark B. Jaksa, Adelaide University, Australia
Gordon A. Fenton, Dalhousie University, Canada
A NEW IDENTIFICATION METHOD FOR AUTOCORRELATION FUNCTION OF GEOTECHNICAL
DATA: THE EXTENDED BAYESIAN METHOD
Yusuke Honjo, Gifu University, Japan
12:30 - 14:00 Lunch
14:00 - 15:30 Session 1C: State of the Art
Session Chair: D. Vaughan Griffiths
Session Co-chair: Helmut F. Schweiger
ASSESSMENT OF THE LUCK ASSOCIATED WITH SETTLEMENT PREDICTION THAT ARE BASED
ON ELASTIC THEORY
William S. Kaggwa, Mei T. Cheong, Mark B. Jaksa, Adelaide University, Australia
GIS APPLICATION FOR STABILITY ANALYSES OF GEOLOGICAL SPACE
Dana Sitanyiova, UTC Zilina, Slovak Republic
PROOF OF FOUNDATION STABILITY USING A CONSISTENT FAILURE MODEL
Kerstin Lesny, A. Kisse, W. Richwien, University of Essen, Germany
PROBABILISTIC APPROACH TO THE MODELING OF DEFORMABLE BLOCKY ROCK MASS
Jacek Jakubowski, University of Mining and Metallurgy, Poland
THE STUDY ON THE EVALUATION OF GEOTECHNICAL RISK BASED ON GEO-STATISTIC
THEORY
Hiroyasu Ohtsu, Kyoto University, Japan
15:30 - 16:00 Coffee Break
16:00 - 17:30 Session 1D: State of the Art
Session Chair: Helmut F. Schweiger
Session Co-chair: D. Vaughan Griffiths
RELIABILITY DESIGN FOR ROCK MECHANIC PROBLEMS
Miroslav Marence, Verbundplan GmbH, Austria
RELIABILITY ANALYSIS IN GEOTECHNICS WITH DETERMINISTIC FINITE ELEMENTS
- A SIMPLIFIED APPROACH FOR PRACTICAL APPLICATION IN TUNNELLING
G. M. Peschl, Graz University of Technology, Austria
NEW EFFECTIVE FOUNDATIONS WITH SOIL HARDENING AND IST DESIGNING
Nicolas Zotsenko, Poltava State Technical University, Ukraine
STATISTICAL SAMPLING SCHEMES FOR INTEGRITY TESTING OF PILED FOUNDATIONS
Gordon Cameron, Sam C. Wamziri, Ian G. N. Smith, Napier University, Edinburgh
DEVELOPMENT OF STRATEGIC MAINTENANCE SYSTEM OF THE ROCK STRUCTURE, WHICH
APPLIED RISK MANAGEMENT
Toru Yasuda, Pacific Consultants Co. Ltd., Japan
BTC PIPELINE PROJECT, INVESTIGATION AT FAULT CROSSINGS
Markus Petschacher, Petschacher Consulting, Austria
GEOTECHNICAL ASPECTS FOR THE SUPPORT DESIGN IN THE TBM SECTIONS OF THE
GOTTHARD BASE TUNNEL
Heinz Hagedorn, Amberg Consulting Engineers, Switzerland
17:30 - 19:00 Dinner
19:00 - 22:00 RISK ANALYSIS ON A CONSTRUCTION PROJECT - An Interactive Workshop
Janette Keiser, Central Puget Sound Transit Authority, USA
TUESDAY, 17 September 2002
07:00 - 08:30 Breakfast
08:30 - 10:30 Session 2A: Risk Management: Client and Contractor
Session Chair: Leopold Weber
Session Co-chair: Peter Schubert
Keynote Address
RISK MANAGEMENT FROM THE CLIENTS SIDE OF VIEW
G. Vavrowsky, HL-AG Eisenbahn-Hochleistugnsstrecken, Austria
Rudolf Pöttler, ILF Consulting Engineers, Austria
RISK MANAGEMENT OF KARSTIC UNDERGROUND CONDITIONS
Stefan Eder, Marcus Plank, Bruno Mattle, Christian Haas, ILF Consulting Engineers, Austria
EVALUATION OF GEOTECHNICAL RISKS AS A PRECONDITION FOR SUCCESSFUL TBM PROJECT
Lars Babendererde, Babendererde Ingenieure GmbH, Germany
RISK ASSESSMENT OF THE MOUNT ST. HELEN'S LEVEE SYSTEM
Stephen J. Romero, Army Corps of Engineers, USA
ALARM THRESHOLDS AND THEIR USE IN DESIGN OF UNDERGROUND OPENINGS
Lars Olsson, Geostatistik AB, Sweden
10:30 - 11:00 Coffee Break
11:00 - 12:30 Session 2B: Risk Management: Client and Contractor
Session Chair: Leopold Weber
Session Co-chair: Peter Schubert
THE REAL AND PERCEIVED SIGNIFICANCE OF SERIOUS RISKS
Hans-Leo Paus, Gerling Consulting Gruppe, Germany
KEY ELEMENTS OF GEOTECHNICAL RISK MANAGEMENT AT SHALLOW TUNNELS
Peter Schubert, IC Consulenten ZT GesmbH, Austria
ALPINE LIFELINES - GEOTECHNICAL AND SOCIO-ECONOMIC ASPECTS OF SUSTAINABLE
GEOHAZARDS AND RISK MANAGEMENT
Bernhard Kohl, ILF Beratende Ingenieure ZT GmbH, Austria
RISK EVALUATION FOR AIR RAID SHELTERS FROM WORLD WAR II
Leopold Weber, Federal Ministry for Economy and Labour Mining Authority, Austria
12:30 - 13:30 Lunch
14:00 - 18:00 Conference Excursion
19:00 - 22:00 Visit to local vineyard
Dinner at vineyard
WEDNESDAY, 18 September 2002
07:00 - 08:30 Breakfast
08:30 - 10:30 Session 3: Earthquakes
Session Chair: Mustafa Erdik
Session Co-chair: Hiroyasu Ohtsu
Keynote Address
THE RISK EVALUATION OF ROCK SLOPES ADJACENT TO ROADS DUE TO EARTHQUAKE
Hiroyasu Ohtsu, Kyoto University, Japan
RAPID SEISMIC VULNERABILITY ASSESSMENT OF BUILDINGS "EQ-FAST"
Holger Dümling, Gerling Consulting Gruppe, Germany
EARTHQUAKE HAZARD ASSESSMENT FOR MAJOR OIL PIPELINES
Mustafa Erdik, Bogazici University, Turkey
EARTHQUAKE ENGINEERING - AN AID FOR SAFETY AND RISK MANAGEMENT
Hansjörg Schmid, TIWAG-Tiroler Wasserkraftwerke AG, Austria
RISK ESTIMATION OF THE EARTHQUAKE INDUCED CHIFENGERSHAN LANDSLIDE IN TAIWAN
Keh-Jian Shou, Cheng-Fung Wang, Yin-Lian Chen, National Chung-Hsing University, Taiwan
A PROBABILISTIC MODEL FOR SEISMIC PERFORMANCE ASSESSMENT OF BURIED PIPELINES
Volkan Yargici, K. Onder Cetin, M. Semih Yucemen, Middle East Technical University, Turkey
CONTROLS COST-EFFECTIVENESS AND JUSTIFICATION ON EARTHQUAKE-PROOF BUILDINGS
Roberto Matus, Guerrero University, Mexico
10:30 - 11:00 Coffee Break
11:00 - 12:30 Session 4: Landslides
Session Chair: Farrokh Nadim
Session Co-chair: Thomas Meschede
Keynote Address
PROBABILISTIC METHODS FOR GEOHAZARD PROBLEMS: STATE-OF-THE-ART
Farrokh Nadim, Norwegian Geotechnical Institute, Norway
RISK EVALUATION METHOD FOR ROCK BED AND SLOPE FAILURE OF ROADS
Yasufumi Iseki, Mamoru Tanaka, Public Works Research Institute, Japan
STOCHASTIC SLOPE STABILITY ANALYSIS OF SPATIALLY VARIABLE SUBSOIL
Paul Chiasson, University De Moncton, Canada
Yu-Jie Wang, China Institute of Water Resources and Hydropower Research, China
RISK ANALYSIS OF LANDSLIDE OCCURRENCE ON THE BASIS OF PROBABILISTIC DESIGN
Sergey Matsiy, Konstantin Shadunts, Ekaterina Bezuglova, Kuban State Agrarian
University, Russia
Andrey Fik, Directorate of gaz-line under construction "Russia-Turkey",
Russia
RISK ANALYSIS FOR CLAYSTONE LANDSLIDE AREAS
Mark Squire, Squire Consulting Services, Inc., USA
MODELING UNCERTAINTY IN LANDSLIDE RISK ASSESSMENTS
Marcus Pacheco, Universidade do Estado do Rio de Janeiro, Brazil
RISK ESTIMATION OF ROAD STRUCTURE ALONG RIVER LEVEE IN CASE OF EARTHQUAKE
Nobuhiko Hamada, Hanshin Expressway Public Corp., Japan
DETERMINISTIC AND PROBABILISTIC ANALSYIS OF ROCK SLOPE DISPLACEMENTS UNDER
EARTHQUAKE LOADING CONDITIONS
Kyu H. Cho, Terry R. West, Purdue University, USA
12:30 - 14:00 Lunch
14:00 - 16:30 Session 5: Waste Contamination and Landfill
Session Chair: Dietrich Mehroff
Session Co-chair: TBA
Keynote Address
RISK EVALUATION OF BROWNFIELDS - SAFETY CONCEPTS AND DEVELOPMENT
Dietrich Mehrhoff, AIG Consultants Holdings Limited, Germany
CUP - CLEAN UP POLICY - HOW CAN THE REMIDIATION OF CONTAMINATED SITES BE
INSURED?
Thomas Meschede, Holger Dümling, Gerling Consulting Gruppe GmbH, Germany
REMAINING RISKS ON REMIDIATION SITES
Juergen Klein, DECHEMA, Germany
RISK ESTIMATION ASPECTS FOR RISK TRANSFER SOLUTIONS
Alex Pittignano, AIG Europe S.A., France
PROBABILISTIC APPROACH FOR THE EVALUATION OF GEOTECHNICAL PARAMETERS -
REHABILITATION OF LARGE OPEN-PIT MINING SITES
Rafig Azzam, Walid Al-Hamdan, Herbert Klapperich, Freiberg University of Mining, Germany
GEOSYNTHETIC REINFORCED STRUCTURES FOR SLOPES AND LANDSLIDE REPAIRS: EVALUATION
OF EXECUTION AND DESIGN CONCEPTS
Gernot Mannsbart, Polyfelt GmbH, Austria
16:30 - 17:00 Coffee Break
17:00 - 19:00 Ad hoc sessions/Free Time
19:00 - 20:00 Social Hour
20:00 - 23:00 Gala Dinner
THURSDAY, 19 September 2002
07:00 - 08:30 Breakfast
08:30 - 11:00 Session 6A: Contracts, Cost and Time
Session Chair: Gert Stadler
Session Co-chair: Janette Keiser
Keynote Address 1
COST, PRICE AND TIME IN GEOTECHNICAL CONSTRUCTION; PREDICTIONS BASED ON
METHODS OF PROBABILISTICS
Gert Stadler, Klaus Jürgen Schick, Graz University of Technology,
Austria
Keynote Address 2
INTERNATIONAL CONTRACT LAW - A COMPARISON OF RISK RELATED LEGAL PRINCIPLES
USED AROUND THE WORLD
Janette Keiser, Central Puget Sound Transit Authority, USA
ON THE APPLICATION OF PROBABILISTICS IN ECONOMIC DIMENSIONING OF URBAN
TUNNELLING PROJECTS
Stefan Heimer, I. Spohr, Heiner Klönne, Zerna, Kopper & Partner,
Germany
GEOENVIRONMENTAL RISKS, FINANCIAL IMPLICATIONS FOR LAND OWNERS
Katsuji Ishihara, Nikken Sekkei Civil Engineering, Ltd., Japan
QUANTIFICATION OF THE GEOTECHNICAL AND ECONOMIC RISK TUNNELLING
Andreas Goricki, Klaus Jürgen Schick, Graz University of Technology,
Austria
Arnold Steidl, Gruppe Geotechnik Graz, ZT GmbH, Austria
RISK EVALUATION OF BUILDING PROCESS BY USING THE ROAD MODEL
Doris Link, Strabag AG, Austria
11:00 - 11:30 Coffee Break
11:30 - 12:30 Session 6B: Contracts, Cost and Time
Session Chair: Gert Stadler
Session Co-chair: Janette Keiser
THE WAYS OF THE MUNICIPAL INVESTMENT FINANCING IN KRAKOW: THE ADVANTAGES
AND DISADVANTAGES FOR THE PRIVATE AND PUBLIC PARTNERS
Slawomir Podgorski, Agencja Rozwoju Miasta S.A., Poland
DEALING WITH GEOLOGICAL RISK IN BOT-CONTACTS: PROPOSAL FOR A SUPPLEMENTARY
MODUL TO BOT-CONTRACTS UNDER INTERNATIONAL COMPETITIVE BIDDING (ICB)
Markus Spiegl, SSP BauConsult GmbH, Austria
Eckart Schneider, Leopold-Franzens-University Innsbruck, Austria
USING A RISQUE METHOD TO PLACE A DOLLAR VALUE ON ENGINEERING RISK
Adrian R. Bowden, Uwe Dannwolf, URS Deutschland GmbH, Germany, Australia
RISK MANAGEMENT IN GEOTECHNICS - A CONTRACTORS VIEW
Manfred Nußbaumer, Ulrich Klotz, Ed. Züblin AG, Germany
RISK-STRUCTURE OPTIMIZATION AND RISK MINIMIZATION BY MAKING DECISIONS IN
PLANNING AND PLACING PROCESS: SPECIFYING, HEDGING, INTEGRATION, INSURANCE
Heiko Meinen, Universität Dortmund, Germany
RISK MANAGEMENT - AN ENGINEERING PRACTICE
Alois Vigl, Vigl Consult, Austria
Johannes Benedikt, ILF Consulting Engineers, Austria
12:30 - 12:45 Conference Close
Return to top.